Skip to main content

News and stories

Compliance GEMS Regulator

08 June 2022

Administrative Appeals Tribunal review outcome for matter Pioneer International Pty Ltd and Greenhouse and Energy Minimum Standards Regulator [2022] AATA 1587

Judge about to hit the gavel in courtroom

On 9 December 2020, the GEMS Regulator under section 54(1)(b)(iv) of the Greenhouse and Energy Minimum Standards Act 2012 (the GEMS Act) cancelled the GEMS registration of a Pioneer International air conditioner (model GR-18CHSA/GIF-18CHSA).

  • The GEMS Regulator was not satisfied the model complied with the relevant GEMS determination as a result of a Stage 1 check test (laboratory testing to determine if the air conditioning unit complies with the requirements of the Greenhouse and Energy Minimum Standards (Air-Conditioners and Heat Pumps) Determination 2013).
  • The GEMS Regulator subsequently issued a notice to the registrant, Pioneer International Pty Ltd, under section 61 of the GEMS Act.
  • The notice required the registrant to either apply to cancel the model’s registration, or arrange for further testing by a certain date.
  • The registrant failed to take either step, and as a result the GEMS Regulator cancelled the model’s registration under section 54(1)(b)(iv).

The registrant challenged the cancellation of the model registration and referred the matter to the Administrative Appeals Tribunal (AAT). Hearings in relation to this matter concluded on 30 September 2021.

On 8 June 2022, the AAT affirmed the decision of the GEMS Regulator. The Tribunal formed the conclusion that the section 61 notice was valid and the exercise of discretion to cancel the unit’s registration in accordance with section 54(1)(b)(iv) was appropriate.

The result supports the work of the GEMS Regulator from an enforcement and education perspective.

The decision and reasons can be viewed on the Austlii website.

Recommended for you

Person holding LED and incandescent lamp

Products

Changes to the registration requirements for lamps

There are changes to how light emitting diode (LED) lamps, incandescent lamps, ballasts for fluorescent lamps, transformers and electric step-down converters for extra low voltage (ELV) halogen lamps are regulated for sale in Australia.

05 May 2025
Workers checking regulated stock for compliance with obligations

Compliance

Greenhouse and Energy Minimum Standards Regulator to monitor registered products linked to state-based energy efficiency incentive programs

The Greenhouse and Energy Minimum Standards (GEMS) Regulator is focusing on monitoring products being offered under energy efficiency incentive programs within each state or territory to identify non-compliance.

30 April 2024
Hospitality person scoping ice

About

Commercial ice-makers now regulated under the Equipment Energy Efficiency (E3) Program

On 3 March 2025, the Greenhouse and Energy Minimum Standards (GEMS) Commercial Ice-makers Determination 2025 was registered on the Federal Register of Legislation. This follows an agreement by the Energy and Climate Change Ministerial Council to regulate these appliances for their energy efficiency in January 2024.

08 May 2025
Was this page useful?
CAPTCHA